Carnavi replaced manual incident logging
Before: two hours a day
WhatsApp, email and the corridor
- Now
- The report is opened at the line
- With
- Photo, owner and deadline
Four documented rollouts at industrial companies, explained by the quality managers of each plant.
2:04
Ana Domínguez · Quality manager
Two hours a day. That is how long Ana and a colleague spent logging incidents by hand. In the video she explains which channels they arrived through and how they are handled now.
See the case study
2:39
Samuel Pardo · Technical department coordinator
From two plants to five. And from 200 people to more than 500, still logging on paper. Samuel explains what stopped working as the operation scaled.
See the case study
2:06
Álvaro Sobrino · Quality director
More than a thousand inspections a year. On incoming material alone. Álvaro explains the move from paper to spreadsheet and from there to logging on a phone or tablet.
See the case study
4:22
Jose Vicente Doria · Quality and Environment Director
An hour, or two, walking the plant every month. That's what the general checklist used to cost with an Excel sheet. José explains why he says Solved «changed our lives».
See the case studyAll three start from the same place: paper, spreadsheets or messaging, with quality, production and maintenance alerting each other. The difference is the system the line staff use today.
Before: two hours a day
WhatsApp, email and the corridor
Incoming inspections
Four business units, one tool